A rain forecast is a useful moment to check who is responsible for stormwater controls before crews leave. Caltrans’ Construction Manual calls for contractors on its projects to monitor forecasts, maintain their controls and keep the necessary materials ready to deploy.
At the next look-ahead meeting, identify the person responsible for the inspection and the supervisor who can authorize corrective work. Walk the areas affected by recent grading or staging changes. Record which controls need attention, who will address them and when the site lead will verify the work.
Use the job’s own stormwater plan and permit to determine inspection and reporting requirements. The right next step depends on the project and its risk level. A brief written handoff can keep a routine task from falling between the office and the field.
Source: Caltrans Construction Manual, Environmental Rules and Requirements.

Write A Comment